Logo Chandra Asri
Chandra Asri Group and Perum Jasa Tirta II Support Renewable Energy Needs at CA-EDC Plant

04-04-2024

Chandra Asri Group and Perum Jasa Tirta II Support Renewable Energy Needs at CA-EDC Plant

Chandra Asri Group has signed a memorandum of understanding with Perum Jasa Tirta II (PJT II) to conduct a feasibility study on the potential of green energy through the development of Solar Power Plants (PLTS) and Hydropower Plants (PLTA). This research aims to promote the implementation of Renewable Energy and support Indonesia's target to achieve Net Zero Emissions by 2060.

The energy from these facilities will be distributed, one of which, to the world-class Chlor-Alkali and Ethylene Dichloride (CA-EDC) Plant currently being developed by Chandra Asri Group, with a total electricity capacity requirement of 340 MW. In addition to power generation, this study will also explore the potential development of a Clean Water Supply System in collaboration with Chandra Asri Group.

Banner
Read Other News
Chandra Asri Group Achieves Logistics Infrastructure Development for the CA-EDC Project
07-05-2026

Chandra Asri Group Achieves Logistics Infrastructure Development for the CA-EDC Project

Chandra Asri Group Supports the Indonesia Short Course Emerging Series to Foster the Next Generation of National Swimmers
11-05-2026

Chandra Asri Group Supports the Indonesia Short Course Emerging Series to Foster the Next Generation of National Swimmers

Chandra Asri Group Receives Three Awards at the 2026 Global CSR & ESG Summit & Awards
29-04-2026

Chandra Asri Group Receives Three Awards at the 2026 Global CSR & ESG Summit & Awards